{"id":5835,"date":"2022-11-30T13:39:00","date_gmt":"2022-11-30T12:39:00","guid":{"rendered":"https:\/\/mero.cz\/?p=5835"},"modified":"2022-12-02T13:41:58","modified_gmt":"2022-12-02T12:41:58","slug":"the-tal-pipeline-intensification-project-is-approved","status":"publish","type":"post","link":"https:\/\/mero.cz\/en\/the-tal-pipeline-intensification-project-is-approved\/","title":{"rendered":"The TAL pipeline intensification project is approved"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"5835\" class=\"elementor elementor-5835\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-2144579 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"2144579\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-d22a2ac\" data-id=\"d22a2ac\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-bf10789 elementor-widget elementor-widget-text-editor\" data-id=\"bf10789\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"MsoNormal\" style=\"text-align: justify;\"><span lang=\"EN-GB\" style=\"font-size: 10.0pt; mso-bidi-font-size: 11.0pt; line-height: 107%; font-family: 'Arial',sans-serif; mso-bidi-font-family: 'Times New Roman'; mso-bidi-theme-font: minor-bidi;\">Kralupy nad Vltavou, 30 November 2022 \u2013 <\/span><b><span lang=\"EN-GB\">MERO \u010cR has succeeded in achieving approval for the implementation of the TAL pipeline intensification project (TAL+). The TAL+ plan was approved at the meeting of the Coordinating Committee, the supreme body of the TAL Consortium, held today, 30 November 2022, in Austria. <\/span><\/b><b><\/b><\/p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span lang=\"EN-GB\">The approval of this project required the consent of all nine co-owners of the Consortium, which are \u2013 including MERO (5%) \u2013 OMV (32%), Shell (19%), Rosneft (11%), ENI (10%), C-Blue (10%), ExxonMobil (7.5%), Connoco (3%) and Total (2%). <\/span><\/p><p class=\"MsoNormal\" style=\"margin-bottom: .0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-GB\">Implementation of the intensification of the TAL pipeline, which is directly connected to the MERO infrastructure in Vohburg, Bavaria, from where more types of crude oil are transported to the Czech Republic via the IKL pipeline as standard, will ensure the Czech Republic\u2019s full independence from Russian crude oil supplies via the Druzhba pipeline from 2025 onwards. <\/span><\/p><p class=\"MsoNormal\" style=\"margin-bottom: .0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-GB\">\u00a0<\/span><\/p><p class=\"MsoNormal\" style=\"margin-bottom: .0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-GB\">The IKL pipeline as such already has sufficient capacity to fully supply the Czech Republic with oil without the Druzhba pipeline, but the TAL pipeline, as it is very busy supplying eight refineries in three EU countries (including both domestic refineries), does not have sufficient capacity to ensure 100% of the Czech Republic\u2019s oil supply. For this reason, MERO \u010cR sought to carry out a plan of strategic intensification of the TAL pipeline in order to fully replace the supplies via the Druzhba pipeline from 2025 and to ensure a full-fledged oil supply to the Czech Republic via TAL.<\/span><\/p><p class=\"MsoNormal\" style=\"margin-bottom: .0001pt; text-align: justify; line-height: normal; mso-layout-grid-align: none; text-autospace: none;\"><span lang=\"EN-GB\">\u00a0<\/span><\/p><p class=\"MsoNormal\" style=\"margin-bottom: .0001pt; text-align: justify; line-height: normal; mso-layout-grid-align: none; text-autospace: none;\"><span lang=\"EN-GB\">In July 2022, the TAL Consortium received a new operating permit from the Bavarian authorities, which legally allows the Consortium to increase the TAL pipeline pumping on Bavarian territory up to a maximum speed of 7,500 m<sup>3<\/sup>\/hour, which is needed to transport the increased amount of crude oil \u2013 approx. 4 million tonnes \u2013 to the Czech Republic to achieve the level of 7\u20138 million tonnes per year required to meet the country\u2019s demand. This increased output can be achieved, but only after the completion of the TAL pipeline intensification project, i.e. after the completion of all the technical adjustments the cost of which is estimated to range between 1.2 and 1.6 billion CZK; the complete process will be completed in about 25 months.<\/span><\/p><p class=\"MsoNormal\" style=\"margin-bottom: .0001pt; text-align: justify; line-height: normal; mso-layout-grid-align: none; text-autospace: none;\"><i><span lang=\"EN-GB\">\u00a0<\/span><\/i><\/p><p>\u00a0<\/p><p class=\"MsoNormal\" style=\"margin-bottom: .0001pt; text-align: justify; line-height: normal; mso-layout-grid-align: none; text-autospace: none;\"><i><span lang=\"EN-GB\">\u201cAfter complex and intense negotiations, when it was necessary to verify the technical, logistical and time feasibility of the project, convince the other TAL co-owners and eliminate their fears of negative impacts on their strategic interests resulting from the implementation of the TAL+ project, it is now possible to prepare contractual arrangements between MERO \u010cR, a.s, and the TAL Consortium, and start, from January 2023, technical adjustments to increase the transport capacity of the TAL pipeline,\u201d<\/span><\/i><span lang=\"EN-GB\"> said <span style=\"background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;\">Jaroslav Pant\u016f\u010dek, Chairman of the Board of Directors and CEO of MERO \u010cR.<\/span><\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-31e3255 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"31e3255\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-5e4e6ba\" data-id=\"5e4e6ba\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-50fcd9a elementor-widget elementor-widget-image\" data-id=\"50fcd9a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"534\" src=\"https:\/\/mero.cz\/wp-content\/uploads\/2021\/02\/2dx-8816-1024x683.jpg\" class=\"attachment-large size-large wp-image-2743\" alt=\"\" srcset=\"https:\/\/mero.cz\/wp-content\/uploads\/2021\/02\/2dx-8816-1024x683.jpg 1024w, https:\/\/mero.cz\/wp-content\/uploads\/2021\/02\/2dx-8816-300x200.jpg 300w, https:\/\/mero.cz\/wp-content\/uploads\/2021\/02\/2dx-8816-768x512.jpg 768w, https:\/\/mero.cz\/wp-content\/uploads\/2021\/02\/2dx-8816-1536x1024.jpg 1536w, https:\/\/mero.cz\/wp-content\/uploads\/2021\/02\/2dx-8816-2048x1365.jpg 2048w, https:\/\/mero.cz\/wp-content\/uploads\/2021\/02\/2dx-8816-scaled.jpg 1500w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Kralupy nad Vltavou, 30 November 2022 \u2013 MERO \u010cR has succeeded in achieving approval for the implementation of the TAL pipeline intensification project (TAL+). The TAL+ plan was approved at the meeting of the Coordinating Committee, the supreme body of the TAL Consortium, held today, 30 November 2022, in Austria. <\/p>\n","protected":false},"author":8,"featured_media":5618,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[22],"tags":[],"class_list":["post-5835","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/mero.cz\/en\/wp-json\/wp\/v2\/posts\/5835","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mero.cz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mero.cz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mero.cz\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mero.cz\/en\/wp-json\/wp\/v2\/comments?post=5835"}],"version-history":[{"count":5,"href":"https:\/\/mero.cz\/en\/wp-json\/wp\/v2\/posts\/5835\/revisions"}],"predecessor-version":[{"id":5840,"href":"https:\/\/mero.cz\/en\/wp-json\/wp\/v2\/posts\/5835\/revisions\/5840"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mero.cz\/en\/wp-json\/wp\/v2\/media\/5618"}],"wp:attachment":[{"href":"https:\/\/mero.cz\/en\/wp-json\/wp\/v2\/media?parent=5835"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mero.cz\/en\/wp-json\/wp\/v2\/categories?post=5835"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mero.cz\/en\/wp-json\/wp\/v2\/tags?post=5835"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}