Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/clients/client0/web59/web/wp-includes/functions.php on line 6114
History of construction - Mero ČR

History of construction

Start of operation of the oil storage capacities:
19944 H03 - H06 tanks each with a volume of 50 thou. m³
19974 H01, H02 and H7, H08 tanks each with a volume of 100 thou. m³
199822 H09 and H10 tanks each with a volume of 100 thou. m³
20032 H21 and H22 tanks each with a volume of 125 thou. m³
20042 H23 and H24 tanks each with a volume of 125 thou. m³
20082 H11 and H12 tanks each with a volume of 125 thou. m³
20201 H13 tank with a volume of 125 thou. m³