Technical data

Total pipeline length
(Vohburg an der Donau – Central Crude Oil Tank Farm in Nelahozeves):
347,4 km
Pipeline length in the CR:168,6 km
Transport capacity:11 million tons of oil per year
Pipeline capacity:Approx. 140 000 m3
Oil speed in pipes:Approx. 0.5 – 1.2 m/s
Pipe diameter:DN 700
Number of stations:1