Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/clients/client0/web59/web/wp-includes/functions.php on line 6114
Technical data - Mero ČR

Technical data

Total pipeline length
(Vohburg an der Donau – Central Crude Oil Tank Farm in Nelahozeves):
347,4 km
Pipeline length in the CR:168,6 km
Transport capacity:11 million tons of oil per year
Pipeline capacity:Approx. 140 000 m3
Oil speed in pipes:Approx. 0.5 – 1.2 m/s
Pipe diameter:DN 700
Number of stations:1