Length in the CR including twinning and branch pipes: | 473,3 km |
---|---|
Pipeline lenght DN500: | 358,8 km |
Pipeline lenght DN700 (twinning): | 36.8 km |
Pipeline lenght DN500 (twinning): | 68,9 km |
Pipeline lenght DN350: | 8,8 km |
Volume of the pipeline including twinning: | Approx. 98 988 m3 |
Transport capacity: | 9 million tons of oil per year |
Oil speed in pipes: | Approx. 1.0 – 1.4 m/s |
Number of stations: | 3 |